20 things to do when you receive your apartment in 2018


For those who first bought the apartment, they will certainly be very embarrassing when the owner informed to pick up the house. The article Realestatevietnam provided below will show you 20 things to do when you receive your apartment.

For your convenience in following up on the 20 things to do when you receive your apartment, Realestatevietnam will split into two parts, including a Common Property Check (Fire Prevention System and Elevator) and Inspection Department. own property (water line, interior and raw).

For common ownership

  1. Check the fire system of the building:

When you pick up the apartment, the first thing you need to do is check the fire system of the building. Check out the fire extinguisher in the corridor (the closest to your apartment). Have basic equipment such as faucets, fire dampers, etc. been equipped? Then you can ask the building staff to try a fire alarm to see if it works, and do not forget to try the sprinklers for a good shot.

  1. Check the elevator operation of the building:

In this test, you see the cabin elevator collapse is not unusual; When the elevator up and down the floor to open, the right or not;

Remember to remember: At this time the elevator of the new building works so before entering the elevator, in spite of the hurry you should also look carefully when the cabin door opens, but the ladder has not yet reached. This is extremely important and should be taken care of to avoid unfortunate accidents.

When taking over the apartment, you should not ignore the fire alarm system of the building

When taking over the apartment, you should not ignore the fire alarm system of the building

For private ownership

In order to be able to check the ownership of your apartment, you must ask the investor to provide a drawing of the electricity and water lines as well as a list of the interior items of the apartment so that it can be easily checked.

For water supply in apartments:

  1. Carefully examine the electrical outlets to see if they have power. In addition, you should also take the time to check the number of electrical outlets, if possible ask the staff of the investor to reallocate them to reasonable, suitable for the needs of the family.
  2. Check the lighting system, including: ceiling lights, kitchen lights, balcony lights, bathroom lights, see if they all work well or if they break.
  3. Check the air conditioning system for normal and stable operation, any strange sounds, and make sure that the hot water tank is leaking out, the pipes are protruding. are not.
  4. In the toilet area, you should carefully check the floor drainage system, see if the floor has a good drainage, floor drainage problems, and you must ensure When water is flushed out, there is no drainage of water.
  5. Check whether the water from the faucets flows weak or strong, especially the water from the toilet hose. Also, you should check if the shower is leaky, if required, ask the developer and the contractor to replace it immediately.
  6. If your apartment is equipped with a hot water dispenser, check the pipe and see if the wiring is hot.
Check sanitation facilities for water leaks

Check sanitation facilities for water leaks

For the apartment interior:

  1. For apartments that have kitchen cabinets, wardrobes, check the open cabinets are easy, there is a difference?
  2. Check if the equipment in the rooms has enough electrical outlets?
  3. Check if the drawer slides are rusty, smooth or not to require replacement immediately.
  4. Check the equipment if any such as: electric stove, magnetic kitchen, garbage bins, … if they have any technical problems or failures, immediately notify the staff of the investor.
  5. Examine the entire floor of the room for pressure, sagging, pitting, and cracking with wall wool, blistering with water or not.
  6. Check the door section (including windows) in the rooms in the apartment are not installed. Are their hinges not warped? Handle, screws are stained or not?
  7. Check for rust, jam, or damaged door locks.
  8. Check the braces, blinds to the toilet is not tight, there is no open, if required to handle.

For the rough part of the apartment

  1. Check that the wall is cracked or not, if the crack must ask the investor to handle immediately, avoid damaging the walls paint the apartment.
  2. Check the walls and ceilings for dirt, scratches or non-flat paint.
  3. Check the ceilings in the rooms to see whether they are flat treated to require repainting. Also, consider the ceiling and walls have the same color, color difference or not.
  4. Check the balcony of the apartment to see if it is dirty, the drainage is good? Avoid overflowing spilled wood flooring.

If all utilities and appliances in the apartment (including shared and private ownership) are OK, you can take the apartment reception and use it. Stamp sealed when locking the apartment again.

Remember to close all doors, turn off the CB at the central panel, lock the door back to the door requesting the door lock test and required hand over the remote and the key. Reset the code and place the new code, invite everyone out and re-seal (ask both parties to sign). Before you go on do not forget to hand over the electricity meter indicators, water at the time of handover.

Finally, work with the management unit to declare the owner of the apartment, register the car, electricity, water, Internet, cable TV, repair apartment …

In order to better understand the process of checking and handing over an apartment, you can download the Checking Document for the handover of an apartment via the link below:

You are reading the article 20 things to do when you receive your apartment in 2018 in the Real Estate category at https://realestatevietnam.com.vn/.Any information sharing, feedback please email to contact.vietnamrealestate@gmail.com, Hotline (+84) 898 898 688 (24/7).

Special thanks!

Đánh giá bài viết

Related Posts
  • VINHOMES GRAND PARK VINHOMES GRAND PARK
    The Vinhomes Grand Park project in District 9 (Thu Duc City) is a mega-urban park of the investor...
  • THE CENTENNIAL BA SON
    Situated in a golden location at No.2 Ton Duc Thang Street, Distric 1, HCMC. The Centennial is...
  • SONASEA VILLAS AND RESORT PROJECT
    Located in Duong To ward, Phu Quoc district, Kien Giang Province, Sonasea Villas & Resort is a...