Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688– Total land area planned: 6.7 ha
– Land area for construction: 42,903.8 sqm
– Construction density of the base block: 32%
– Building density of towers: 25%
– Total floor area: 378,925 sqm.
– Number of floors in phase 1: Block 1, 2: 35 floors (including 01 technical floor), Block 3, 4: 34 floors (including 01 technical floor).
– Total number of apartments: 3,175 apartments
– The total greening of the project: 40%
– Number of blocks: 12 blocks
– Area: 9,256sqm.
– Length of water surface around the project: 775 m.
– Ownership: Public land available for residents of the NRC.
– Implementation time: Developed by DXG to complete the project.
Security system includes:
– Camera tracking system is arranged: parking area.
– magnetic card control system into the elevator lobby.
Fire prevention and fighting systems include:
– Fire alarm system for each function room and apartment by area.
– Automatic fire fighting system combined with wall fire fighting.
– 15m – 40m
– Handing over regulations and commitments from investors.
– Customers can change after receiving the house.
Much of the space is vacant, and there are layout systems in place.
Technical transfer pits in the basement, 2nd floor, and 3rd floor.
Elevators of reputable firms: Schindler, Kone, Thyssenkrup or similar.
Customers are only allowed to change after receiving the house, not to intervene technical systems and load-bearing walls.
Customers are only allowed to change after receiving the house, not to intervene technical systems and load-bearing walls
Perspective 2- bedroom apartment project Gem Riverside
Only provide hot and cold water for toilets, lavabo faucets.
Road N3 about 15m, road N5 about 16m, sidewalk each side 4m.
Wooden flooring for the bedroom: Size, specifications, type, brand by design, materials imported.
Escape ladder of cement.
The fire alarm in the apartment, the fire head arranged according to fire protection design requirements.
Height from floor to floor is 3.2m (height may vary depending on the design of the Ministry of Construction).
Ceiling height 2.5m. 1.8m wide corridor (heart wall).
Structural floor design, thickness from 150mm to 250 mm depending on the design.
High ceiling.
>>>See more information about the real estate market here: Vietnam real estate market
There is no central gas system.
Elevator speed 2m / s. Using ladders weighing 900kg -1000kg.
There is a garbage collector at each floor, rubbish through the vertical pipe. Garbage collection and collection facility located on the ground floor.
Security work is only carried out on the project premises.
Generator system located in technical room in basement.
No, according to the general rules of operation and use of the apartment. Design details take into consideration the safety factor in use and ensure design standards.
– The main door size in the apartment: 1.2m x 2.1m (2 wings).
– Dimension of bedroom door: 0.8 x 2.1 m.
– Toilet door size: 0.7 x 2.1m.
Windows (safety glass) and apartment doors have no protective frames. Design details take into consideration the safety factor in use and ensure design standards.
Please refer to standard material finishing flats.
Air-conditioned. Air conditioners will only be fitted with gas and condensate piping, WC suction units will be installed depending on the location of the WC to ensure the standard of use.
Design and light color.
Perspective of 3-bedroom apartment project Gem Riverside
Customer can change after receiving the house.
The project includes 12 blocks, 35 storeys, 2 – 3 storeys.
Please refer to the detailed statistics for each type of apartment.
No tree planting. Terrace can be reached, for the purpose of escape.
Fire alarms in the apartment are designed, installed and handed over according to the standard, but can not be repaired or altered without any notice from the operator.
Yes.
Apartment warranty period is calculated from the time of completion of acceptance with state agencies.
Electricity meter managed by local power company. Water meter managed by the unit operating the apartment. Water and electricity indexes are fixed at the time of hand-over.
You are reading the article 38 things you need to know about Gem Riverside project of Dat Xanh Group in the Real Estate category at https://realestatevietnam.com.vn/. Any information sharing, feedback please contact through Hotline (+84) 898 898 688 (24/7) or email to info@realestatevietnam.com.vn.
Special thanks!