Home / NEWS & EVENTS / The construction site of Waterina Suites District 2
The construction site of Waterina Suites District 2
Date: 05-05-2018 | 02:51
Views: 143
The air of construction at Waterina Suites project is very exciting, fast progress and is expected to complete the plan.
The latest progress of Waterina Suites project District 2
According to Realestatevietnam, up to now, the Waterina Suites has been constructed by Cofico, the main contractor, to the 7th floor (See the actual progress below). Information from the investor shows the completion time and handover of the Waterina Suites project in the third quarter of 2019.
The construction atmosphere at the Waterina Suites project is quite bustling
According to Realestatevietnam, compared to many other apartment projects in Ho Chi Minh City, Waterina Suites District 2 is applying different construction techniques.
Waterina Suites with Palm City, Estella Heights are the first residential projects in Vietnam using reinforced concrete wall and wall systems.
In return for the above advantages, the only disadvantage of this technique is the cost doubled compared to the traditional brick wall and brick.
Each Waterina Suites apartment is also equipped with a power line to the ceiling.
It can be said that each apartment at the Waterina Suites project is designed with sophistication from the attention to the smallest details.
The project has now reached the 7th floor
You are reading the article The construction site of Waterina Suites District 2 in the Real Estate category at https://realestatevietnam.com.vn/. Any information sharing, feedback please contact through Hotline (+84) 898 898 688 (24/7) or email to contact.vietnamrealestate@gmail.com. Special thanks!