Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688

The pool and park area at Jamila Khang Dien is under development.

Up to now, the swimming pool area of the project has been brick finished.

The spillway area is being accelerated.

The area around the pool is rocky.

Sidewalk is being stoned.

Block A – Fabrication of reinforcement, reinforced beams of floor 23, poured concrete floor.

Block B – Installation of reinforcement, reinforcement wall panels on the floor level 25.

Block C – Install glass, gypsum ceiling and primer.

Block D – Fabrication and installation of reinforced steel wall panels on the 25th floor
Jamila Khang Dien apartment is open for sale phase 1 in May 2016 and is expected to be handed over in January 2019. The project with 867 apartments from 1 bedroom to 3 bedrooms was handed over. This is Khang Dien’s first apartment project. According to information from Khang Dien, in 2018, this investor will start construction and sale of Sapphira Khang Dien project in District 9. The project has more than 1500 units. Currently, the project is a lot of customers are interested.
You are reading the article Jamila Khang Dien apartment project’s beauty District 9 in the Real Estate category at https://realestatevietnam.com.vn/.Any information sharing, feedback please email to contact.vietnamrealestate@gmail.com, Hotline (+84) 898 898 688 (24/7).
Special thanks!