Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688Owner: Vingroup Corporation.
Company Address: 38/12 Nguyen Van Troi, Ward 15, Phu Nhuan Dist., HCMC.
Project office address: 720A Dien Bien Phu, Ward 22, Binh Thanh Dist., HCMC
Model house address: 208 Nguyen Huu Canh, Ward 22, Binh Thanh Dist., HCMC
– Nha Trang, Vinpearl Phu Quoc, Vinpearl Luxury Da Nang
– Residential real estate projects: Vinhomes Dong Khoi, Vinhomes City Times, Vinh City Royal City, Vinhomes Riverside. – Especially, the project has started and is building two projects: Vinhomes Nguyen Chi Thanh in Hanoi and Vinhomes Central Park project in Ho Chi Minh City.
– Vincom Shopping Mall and Vincom Mega Mall across the country.
Inspired by the world-famous Central Park in New York. Vinhomes Central Park evokes the imagination of an urban area – the most modern and advanced park, converging all the highest standards, located in prime location in the heart of Ho Chi Minh City, extremely convenient on traffic but still maintain a fresh environment, in harmony with nature on the banks of the Saigon River.
The project is located in a very favorable location in the heart of Ho Chi Minh City, the frontage stretching along the Saigon River is longer than 1 km, which is convenient for transportation by road, waterway and in the future will be very Near No. 5 Metro Ben Thanh – Suoi Tien.
Regional link: Just 2 minutes to Ben Thanh – Suoi Tien metro line, 3 minutes to Thu Thiem new urban area and 4 minutes to Ho Chi Minh city center.
Highlights: The Tan Cang project is one of the three remaining large blocks in Ho Chi Minh City with fronts adjacent to the river (Tan Cang, Ba Son, and Khanh Hoi port). All the apartments and villas of Vinhomes Central Park enjoy the fresh air from the Saigon River, wide view.
Construction Management: Vincom Construction Management Company 1.2.
Building Management: Vinhomes Company
Right. Vincom Construction Company 1.2 is in charge of Construction Supervision and Construction Management.
Overall project: 43.91 hectares
Construction density of the whole area: ~ 16%. Area of green trees: ~ 13.8 hectares.
– Apartments and officetel (from 1 to 4 bedrooms, area from 50 sqm – 200 sqm)
– Single and double villas (165 sqm – 750 sqm)
– Penthouse duplex / penthouse
– 81-storey landmark tower – the tallest building in Vietnam (shopping centers, offices for lease, apartments, serviced apartments, hotels, …)
The whole project consists of 17 apartment buildings and 81-storey tower including shopping center, hotel and office for rent.
The height of the apartment area from 38 to 50 floors (see details in No. 22)
Each floor has 10, 12, 14 apartments divided into 2-3 separate clusters (depending on each court)
Each tower consists of 2 – 3 blocks.
Each block has 4 – 5 lifts and 1 escalator.
Load: 1,000 – 1,350kg.
Types of apartments are expressed in detail and complete on the sales documents. Some typical apartments for customers to refer to:
– One-Bedroom Apartment: 40.7sqm, 42.6sqm, 47.4sqm, 48.1sqm, 52.7sqm
– 2 bedrooms apartment: 68.8sqm, 69sqm, 69.2sqm, 71.3sqm, 76.8sqm, 77.9sqm, 83sqm, 90.8sqm
– 3 bedrooms apartment: 106.6sqm, 110.3sqm, 114.2sqm, 122.4sqm, 135.2sqm
– 4 bedrooms apartment: 135.4sqm, 142.2sqm
13 – 35m (including sidewalks).
2.7m (waterway).
Minimum 25m.
The pool is used as follows:
– Court C3: 01 private swimming pool.
– Cluster C1, C2: General 01 swimming pool.
– Cluster P1, P2, P3 & P7: one swimming pool.
– Cluster P4, P5, and P6: 01 swimming pool
Area C1.2: DT 450sqm, narrowest width: 8m, length: 39m
Area P1, 2, 3, 7: DT 1600sqm, narrowest width: 16m, length: 80m
Area P4, 5, 6: DT 1100sqm, narrowest width: 12m, length: 60m
Zone L1, 2: DT 800sqm, narrowest width: 11m, length: 45m
Zone L2, 3: DT 500sqm, narrowest width: 15m, length: 24m
Area C5, 6: DT 450sqm, narrowest width: 10m, length: 32m
Area C6, 7: DT 450sqm, narrowest width: 10m, length: 32m
Zone C4: DT 350sqm, narrowest width: 9m, length: 28m
Note: Parameters can be adjusted according to actual planning.
Safety glass 2 layers 10.38mm thick.
Not many people work (only operation, maintenance, operation)
There is a water tank at the floor.
VRV (central air-conditioning) units run the building, with a noise level of 50-60 DBA
Supply water pumps and hot water tank, running the building operation moderate noise level.
The 2.7m elevator area, the corridor leading to the 1.8m apartment.
Ground floor is 5m high, 1st floor is 4m high (coarse from floor to floor).
High 4m / floor (coarse from floor to floor).
Complete height from floor to false ceiling (high water): 2.7m
Floor height to floor: 3.4m
Vinschool 5 floors high. The height of each floor is about 3.9m (floor to floor)
Vinmec 7 floors high. The height of each floor is about 4 – 4.5m (floor – floor)
Height from base 0.00 to top of roof (including technical floors):
Court C1 is 137.4m (38 storeys)
The C2 Tower is 168m (47 storeys)
The C3 Building is 168.5m (47 storeys)
Central Court 3: 2 basements
The rest: 3 basements. In which the following clusters have interconnected tunnels:
Central 1, Central 2, and Park 1 – Park 7 (total 9 courts)
Landmark 1, 2, 3 (3 courts), and The 81st Street Lanmark
Central 5, 6, 7
Central 4
Yes
Each floor has a central garbage. When it comes time for employees to collect garbage handle.
According to the design safety standards of Vietnam, and consulted by Singapore experts.
There are 5 main accesses to the project (see the Master Plan below), including:
Option 1: River way across Saigon Pearl
Option 2: From Nguyen Huu Canh to Vinmec & Central 3
Way 3: From Nguyen Huu Canh between Central 4 & Central 5}
Option 4: From Nguyen Huu Canh turn to the foot of Sai Gon bridge
Option 5: From Dien Bien Phu around the bridge
Of which, there are 3 main entrances to the project:
Currently: Gate entrance (4) (from Nguyen Huu Canh around the foot of Saigon Bridge)
In the future there are 2 main ports:
Gate in the way (2) (from Nguyen Huu Canh between Vinmec BV & Central 3)
Gateway to exit (3) (from Nguyen Huu Canh between Central 4 & Central 5)
See the overall diagram above.
2nd way (from Nguyen Huu Canh to Vinmec & Central 3): about 191m
Route 3 (From Nguyen Huu Canh between Central 4 & Central 5): about 91m
Route 4 (From Nguyen Huu Canh turn to the foot of Sai Gon Bridge): straight out Nguyen Huu Canh Street
Another way (from Nguyen Huu Canh to Central 3 & Vinschool): about 178m
Central 1, Park 1 is located closest to the river, only 158m from the river.
It is a high-class park, closely managed, ensuring security, hygiene and aesthetics, guests outside can enter.
Intensive Vinschool tuition is expected at $2,700 / year. Pre-school has fee at the price of $2,300 per year.
Transferable to others if the landlord has no need to use.
VINMEC CENTRAL PARK International Hospital has a size of 178 beds on a total area of 7,800 sqm, construction area is 3,100 sqm. Total construction area consists of 7 floors and 3 basements is 38.643 sqm with the model of modern international hospital to serve the needs of high-level health services of HCMC residents and localities. shallow.
A team of Vietnamese and international medical specialists who are highly qualified, experienced and well trained.
Facilities:
+ 36 complete outpatient clinics plus accompanying function rooms
+ 5 main operating rooms
+ 1 room for cardiovascular intervention
+ 3 living rooms
15 beds (10 adults + 5 children)
The imaging system includes the latest generation of machines such as MRI 3 teals, CT scan 640 slices, X-rays, ultrasound, respiratory endoscopy, digestion.
+ Modern and synchronized Labo system including: Microbiology, Hematology & Immunology, Biochemistry and Pathology
+ 1 Comprehensive cancer treatment center allows screening, early diagnosis of treatment: surgery, chemotherapy & radiation treatment with the most up-to-date technology.
Construction commencement date: 26/07/2014
Delivery time Vinmec Central Park and villa: 2015
Yelp, Vineyard and Park Transit Times: 2016
Completed time: 2017
Complete fully furnished interiors, including toilet, kitchen equipment, wall cabinets, air conditioning. Detail by material table and equipment handover apartment.
Wood moisture-resistant industrial imports MDF, Wanfai brand MFC. Origin: Thailand.
For unoccupied apartments, there is no strict allocation policy in order to ensure a high standard of living for residents, avoiding the continuous improvement of construction of apartments in the building.
Depending on the location, if it does not affect the structure of the building and must be approved by the Investor, and commitment to complete early, so as not to affect the surrounding residents.
Can be considered if the buyer in the new phase complete foundation, payment and capital support equivalent to 100% of the Price.
Vinschool Central Park
Vinmec Central Park General Hospital
5-star luxury marina
Indoor ice rink
VINKE (playground for children)
Cinema
Swimming pools in all apartment buildings
Outdoor playground system (tennis, badminton, etc.)
Lounge
Five-star Club – House, Gym, community activities
Outdoor play area, mini golf-Putting exercises, pet care services
Service:
Customers can choose to pay a courtesy package with the Investor’s Service, which includes a free 10-year management service, VIP Vinmec Healthcare package, Vinschool scholarship. There are also:
The customer service center is available 24/7
Family service (5-star standard): moving house, industrial hygiene, household cleaning, laundry, tree care, weeding / planting, garden care.
Repair service, maintenance
Catering service at home
Office services: photocopy, printing, air ticket booking, express delivery, flower arrangement, …
Assist tenants to rent properties and manage tenants instead of landlords
Value Added Services:
Backup power system: 100% provision for apartments and villas, including air conditioning
Domestic water supply and drainage reserve system: There is a reserve water tank with a purified water filter system that meets drinking water standards.
Management fee includes: Pool use fee and outdoor sports ground system
24/7 security service Cleaning and cleaning services for common property and public utilities Pick-up – waste treatment and landscape preservation Fire prevention and fighting system according to standards TCVN Ph services for measurement devices for electricity consumption and water consumption, collection and payment of electricity and water costs and other living expenses for common property and public utilities.
The 10-year free-of-charge period commences from the delivery of each property and applies to both the Villa and Villa (unless the customer chooses to convert the gratification service into cash).
Villa buyers do not have to pay maintenance funds.
For apartments maintenance fund is 2% of the selling price of apartments without VAT Collected Maintenance Fund aims to provide funding for the costs of repair, maintenance – replacement – installation – infrastructure upgrades, or other repairs of the common area, utilities under common ownership, common use of the Apartment and Projects area are not covered by the warranty.
General amenities in a secluded area reserved for residents, outsiders or relatives-friends of residents in the local utility must be guaranteed by the owner of the Vinhomes Central Park, however there is a charge (if applicable). ) When used in accordance with regulations.
Long-term parking lot registration (property still belongs to investor).
According to the regulations of the state and the company providing electricity and water for the Project.
At the same price level of similar buildings. Details specified by the PMB.
Each floor has central garbage. What’s time for employees to collect garbage handle.
For air conditioning: The seller will provide the warranty within the time limit specified by the manufacturer
For plumbing: the seller is responsible for the warranty, except for damage caused by natural disasters, enemy sabotage or user-induced damage.
Cost: During the warranty period, the warranty will be paid by the seller.
On housing warranty contents: The house warranty contents (including mixed-use dwelling houses) include repairs and remediation of structural structural damage to houses (beams, columns, floors, ceilings, roofs, walls, tiles, plasterboards), devices attached to houses such as systems of doors, fuel supply system, Electricity supply, lighting, water supply system, waste water drainage, overcome cases of tilt, subsidence, slump. For other equipment attached to the house, the seller shall carry out the warranty within the time limit specified by the manufacturer.
Legal grounds: Article 46 of Decree 71 and Article 74 of the Housing Law.
Use Video door phone or Interconnect connected from basement, reception to apartment.
Use fingerprint access control instead of a magnetic card, so customers do not charge a card.
Apartment: Long-term ownership
Officetel apartment / shophouse: owns 50 years
Villa: Long ownership
The time of red book delivery depends on the state agency, nvestor will make every effort to make the book as soon as possible. In fact, Vingroup’s projects such as Vinhomes Riverside, Vinhomes Times City and Vinhomes Royal City have all booked for guests in quick time.
Yes, according to state regulations on the ownership of real estate for foreigners and overseas Vietnamese. (According to Resolution No. 53 of the National Assembly on the socio-economic development plan for 2014, during the time the new Housing Law has not yet come into effect (the effective date of the Housing Law is July 1, 2015), Continue applying Resolution 19/2008 and Decree 51/2009 on the pilot for foreigners to buy and own houses in Vietnam After the 2014 Housing Law comes into force (1/7/2015), will apply in accordance with the Housing Act 2014)
Can be purchased in case the customer buy early (Investor will advise specific case, in order to ensure the legal).
If the project expires 50 years and the project is extended, the HDT will be extended accordingly.
In addition, the HDT will stipulate: (i) Lease term: including renewal term; (Ii) Rent: for the lease term and the extended term (ie, if the lease is extended, customers do not have to pay more rent).
The actual terms will be in accordance with the applicable law at the time of renewal.
Get transferable deposit, no initial charge. After the signing of the contract, the contract is still transferable but must comply with the provisions of the law governing the transfer of the Purchase and Sale Agreement.
Techcombank and some other prestigious banks. We are coordinating the development of lending programs to bring the best benefits to customers, will publish the soonest.
On November 20, the People’s Committee of Ho Chi Minh City has agreed to invest in building and upgrading some arterial roads connecting the Saigon New Port area and the city center to develop transportation infrastructure and clearly resolved serious flooding in the past several years. Vingroup Group will implement the improvement of Nguyen Huu Canh Street; Construction of the riverside route from Ton Duc Thang Street to the underpass under Saigon Gully and Ung Van Khiem Road.
See more news information at: Vietnam Real Estate News