No Comments

HCM City – Long Thanh – Dau Giay High – Speed Line Is About To Start

On April 29, the City People’s Committee will hold the commencement ceremony of the parallel road project from Mai Chi Tho street through Nam Rach Chiec residential area to Ring Road 2 (at An Phu intersection along the expressway Long Thanh – Dau Giay) at the temporary street Nam Rach Chiec residential area, District 2.

It is known that the parallel road project has a total investment of VND 869 billion by joint venture Nam Rach Chiec Co. and Tien Phuoc Real Estate Joint Stock Company is an investor in the form of BT. The project consists of two parallel roads to the right of Ho Chi Minh City – Long Thanh – Dau Giay Expressway. Section 1 is 2,769.96 m, with the starting point being Mai Chi Tho Street and the end point is Do Xuan Hop Street. Section 2 is 617.6 m  with the starting point D11 and the end point is Belt 2.

The project also builds three bridges on the route: Ba Dat, Muong Kenh and Ba Hien. The total length of the three bridges is about 566.94 m.

Parallel lines
On April 29, the construction of a parallel road from Mai Chi Tho Street through Nam Rach Chiec Residential Area to Ring Road 2 will officially commence.

At the same time, they build and renovate intersections on the route with existing and planned routes; Construction of technical infrastructure in line with the road construction: rain water drainage, lighting, technical trenches, green trees … The project implementation period is from 2016 to 2018.

The project will have more elements that are profitable if the investment is always high, because that will be a place to live.

Survey on the market, the appearance of Jamila Khang Dien project is considered as a project in the population of civilized, modern in District 9 today. Jamila Khang Dien is located in front of Contemporary Road, Ho Chi Minh City – Long Thanh – Dau Giay expressway (at Do Xuan Hop intersection) and be adjacent to the upscale The Venica villas and civilized residential areas like Lakeview City, Palm City …

Especially, from Jamila residents can quickly get to the highway as well as to the city through Mai Chi Tho Boulevard, just steps away from District 2, takes 5 minutes to Thu Thiem new city and 10 minutes to the center of District 1.

Parallel lines
Jamila Khang Dien Project District 9

The traffic infrastructure in this area has been synchronously invested, with many roads have been opened, especially the Ring Road 3, Cat Lai Bridge, Metro No. 1 … that help to move to the neighboring areas such as Dong Nai, Vung Tau … easily. Looking at the reality, Jamila Khang Dien also has the advantage of being surrounded by two sides of the river to create a strong position, ensuring air convection, air conditioning and is the ideal place for intellectuals to live. See detailed information about Jamila Khang Dien project here.

With leading brand units in the field of construction and real estate development such as Hoa Binh as general contractor, Ong & Ong design consultants, SCQC quality management and CBRE residential management they make a perfect Jamila from space to living environment for the residents here with a reasonable price, only from VND 22.5 million / sqm.

>>>Read more: Vietnam Real Estate News

Jamila Khang Dien had a parking garage and magnetic card in each apartment

The lack of parking space is happening throughout apartment projects in Ho Chi Minh City. Therefore, from the design Jamila Khang Dien has plans to use the entire area under four buildings and central utility for storing parking space. However, each floor has its own security magnetic card to enter each apartment. At the same time, the owner also allocates a reasonable area right in the area around the building to add more parking to residents and visitors outside the area.

You are reading the article HCM City – Long Thanh – Dau Giay High – Speed Line Is About To Start in the
Real Estate category at https://realestatevietnam.com.vn/. Any information sharing, feedback please email to
info@realestatevietnam.com.vn, Hotline 0909890897 (24/7).
Special thanks!

HCM City – Long Thanh – Dau Giay High – Speed Line Is About To Start
Review

Comments (0)