Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688In particular, Vice Chairman of HCMC People’s Committee Tran Vinh Tuyen has just signed a letter to departments and departments on the construction of a temporary bridge crossing Vam Thuat River, replacing the old ferry berths between Saigon.
According to the document signed on August 22, the People’s Committee of Ho Chi Minh City approved the proposal to continue implementing the project construction temporary An Phu Dong under the policy approved in 2017.
This bridge will replace An Phu Dong ferry on Vam Thuat River, connecting from Ward 5 (Go Vap District) to An Phu Dong Ward (District 12).
The HCM City People’s Committee assigned the Department of Transport to instruct the investor to complete the procedures and implement the project in accordance with regulations. The process of construction, there must be solutions to stream flow, ensure road and waterway traffic safety.
City’s People’s Committee also requested the Department of Planning and Architecture, Department of Planning and Architecture, People’s Committee of District 12 and related units to study the plan of transportation complete in An Phu Dong ward, appropriate investment projects.
An Phu Dong ferry is one of the few places to transport tourists to the river by ferry in Ho Chi Minh City durring peak hours, only two ferries take turns.
Recently, the HCM City People’s Committee approved the upgrading and expansion of Pham Van Bach Street, Tan Binh District – Go Vap District. This decision additionally includes an expansion of about 659m of Tan Son Road (from Golf Course Gate to Quang Trung Street) from 2 lanes to 4 lanes to synchronize 4 lanes.
The section of Nguyen Sy Sach street connecting Pham Van Bach street (road, drainage, trees, lighting) will be built about 37m long and 18.5m wide. Add traffic signal system at Pham Van Bach – Tran Thai Tong crossroads, Pham Van Bach – Tan Son, Pham Van Bach – Nguyen Sy Sach and Pham Van Bach – Nhanh 5 junction – Huynh Van Nghe.
To calculate the compensation and support of the project to upgrade and expand Nguyen Cuu Phu Street, Tan Tao A Ward, Binh Tan District, Ho Chi Minh City People’s Committee has approved the adjustment coefficient of land price at the adjacent two The front of Provincial Road 10 (section from National Highway 1A to Tan Tao Bridge) and Nguyen Cuu Phu Street (No. 1411B and 1413 Provincial Road 10) are 3.8567.
At the same time, the City People’s Committee has approved the proposed investment project to upgrade and expand Nguyen Duy Trinh Street (section from road No. 990 to the intersection of ring road 2), District 9 in the form of public-private partnerships (BT contracts) with total investment of VND737 billion.
The expansion of Nguyen Duy Trinh Street aims to reduce congestion and traffic accidents, improve the traffic system in the area to meet the needs of urban development along the highway, improve sanitation conditions. school, urban landscape. The project is expected to be implemented from 2018 to 2020.
Ho Chi Minh City People’s Committee has just decided to invest to upgrade and expand To Ngoc Van (Thu Duc) to 30m, although only 3km long, but this route plays an important role to connect Tan Son Nhat airport Tables in Tan Binh, Go Vap, Binh Thanh, Thu Duc.
The project to upgrade and expand the To Ngoc Van road to 30m has been approved by the People’s Committee of Ho Chi Minh City since early 2017 and will be implemented in the near future and completed in 2020. After Upon completion, this route will connect directly from Pham Van Dong Boulevard to Thu Duc intersection, where the central metro station is being built.
Prior to that, the HCM City People’s Committee also assigned the Department of Planning and Architecture to propose functional zones of the Nguyen Hue pedestrian street, district 1 and to add water fountains and lighting systems. The Department also has to research and adjust the sanitary area, trash, seats, automatic water stalls, street food areas, car parking … serve visitors when The big city event is crowded.
Department of Planning and Architecture of Ho Chi Minh City is also required to study the overall connection of the Nguyen Hue pedestrian street with the park area in front of the Opera House and Le Loi street, connecting the streets of Nguyen street Hue – Ton Duc Thang – Ham Nghi.
In preparation for upgrading and renovating Nguyen Hue Street (the section from Le Loi Street to Bach Dang Park), the HCM City People’s Committee also asked Nguyen Hue Street Management Committee to report on the operation of this street. more than 3 years into operation.
You are reading the article Ho Chi Minh City is about to bridge Go Vap District and District 12 in the Real Estate category at https://realestatevietnam.com.vn/.Any information sharing, feedback please email to contact.vietnamrealestate@gmail.com, Hotline (+84) 898 898 688 (24/7).
Special thanks!