No Comments

Perspective and location of Thu Thiem Bridge 2

It is expected that by 2019 Thu Thiem Bridge will be completed. Invested nearly VND3,100 billion, Thu Thiem 2 Bridge is expected to be a prominent architectural highlight on the Saigon River, as well as to create a dynamic development of Thu Thiem new urban area.

Thu Thiem Bridge 2 was started construction in 2015 by the investment company Dai Quang Minh as investor. Thu Thiem 2 has 6 lanes including 4 lanes and 2 lanes, 1.5 km long. The 900 km long bridge is designed with the main tower 113 meters high. The inclination of the bridge tilts towards Thu Thiem as the logo greetings from the city center through Thu Thiem new urban area.

Thu Thiem Bridge 2’s Location
Thu Thiem Bridge 2’s Location
Perspective of Thu Thiem bridge 2
Perspective of Thu Thiem bridge 2

Thu Thiem Bridge has a bridge at Ton Duc Thang – Le Duan intersection. Running along Ton Duc Thang Street in District 1, crossing the Saigon River and connecting to the Boulevard Boulevard (Route R1) in Thu Thiem New Urban Area, District 2. Thu Thiem 2 connects District 1 with Thu Thiem new urban area. , contributing to the improvement of the city’s main transportation system, and linking the transportation network between Ho Chi Minh City and the Southeast provinces.

You are reading the article Perspective and location of Thu Thiem Bridge 2 in the Real Estate category at https://realestatevietnam.com.vn/.Any information sharing, feedback please email to info@realestatevietnam.com.vn, Hotline 0909890897 (24/7).

Special thanks!

Perspective and location of Thu Thiem Bridge 2
Review

Comments (0)