Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688As planned, Ring Road 3 of the city has a total length of 97.7 km. Road sections passing through the following localities: Ho Chi Minh City, Dong Nai, Binh Duong and Long An with six lanes of traffic and two emergency lanes. Estimated total investment of the project is VND 55,805 billion.
The Ring Road 3 project is divided into 4 phases of construction, each phase will complete the corresponding items:
Swan Bay is a modern urban area with many transportation facilities when Ring Road 3 is completed. The move to the city center as well as connecting the districts from the project shortened the time and distance. The remote location problem no longer hindered the investment or settlement of the Swan Bay project.
Along with the orientation of building Ho Chi Minh City as one of the largest cultural, economic and technological centers in the country, the pressure on population growth along with the accompanying consequences The construction of a satellite city is considered to be groundbreaking. This is also an indispensable demand for the dynamic and sustainable development of Ho Chi Minh City.
A satellite city was established to share the pressures of the population, work, housing and transportation to the city center. In Ho Chi Minh City, in the new development phase, it was proposed to plan the construction of satellite city for 4 areas of the city. In particular, in the East, beside the satellite towns have been established and put into use, other urban projects are being approved to put into operation.
Highlights include the Swan City-sized urban area with two associated projects – Swan Bay and Swan Park. Both projects are large scale, apart from supplying the market with a large number of townhouses and villas. These projects also build a new civilized and modern community. Taking the new development trend of the market, investors who have plans to develop sooner will be more profitable.
According to the planning of transport infrastructure in the East of the city, many transport items continue to be deployed and urgently completed to renovate the urban East:
Swan Bay is expected to be open for sale at the end of June, with an estimated selling price of 3-6% over the first phase (Phase 1 has been sold out). Private Company is carrying out the following specific booking:
Reservation:
Over here, Rever has sent Swan Bay information in the potential development of satellite city planning of Ho Chi Minh City. In addition, for more investment options, transportation options and prices for each of the Swan Bay subdivisions, you can download the Swan Bay Project Analysis and Assessment via the download link below here:
You are reading the article Swan Bay in the potential development of satellite city planning of Ho Chi Minh City in the Real Estate category at https://realestatevietnam.com.vn/. Any information sharing, feedback please contact through Hotline (+84) 898 898 688 (24/7) or email to contact.vietnamrealestate@gmail.com.
Special thanks!