Hotline:
(+84) 898 898 688Hotline:
(+84) 898 898 688Under the plan, VinCity Grand Park is built on a land of 356 hectares. The project is located on Nguyen Xien street with Phuoc Thien, Long Binh ward, District 9, HCMC. Ho Chi Minh. This is a central location with two sides bordering the river and near the high technology district 9.
VinCity Grand Park is located near the Ho Chi Minh – Long Thanh – Dau Giay Expressway, Hanoi Highway and Metro 1. These routes are the main arterial roads, leading to District 1 only takes about 20 minutes running car.
If you want to move to District 2, residents can choose Long Thanh – Dau Giay Expressway, Mai Chi Tho Line through Thu Thiem Tunnel to East – West Boulevard.
To go to District 7 can choose to Highway 2 – Phu My Bridge – Nguyen Van Linh – Ho Chi Minh Highway Trung Luong.
To come to District 5, Binh Thanh District can choose to go through Mai Chi Tho.
Long Thanh Airport, the new East Bus Station is being built, residents can move through the Ring Road 3 to be completed.
As a result, VinCity Grand Park residents can travel to city districts quickly through arterial traffic routes without the risk of traffic congestion. In addition, if you want to go to the provinces in the West you can go to the freeway belt 2. The 80m wide road has been open since 2015.
VinCity Grand Park also connects with the Eastern, Central and Northern provinces through the Hanoi Highway, Highway 51 – Dau Giay – National Highway 1. Connecting the neighboring provinces of Dong Nai, Bien Hoa, Lam Dong, Binh Thuan via TP. Ho Chi Minh City – Long Thanh – Dau Giay.
In addition to the Dong Nai and Tac rivers, roads and railways are accessible by river. Traveling to Long Thanh Airport is also convenient.
Not just adjacent to the main roads, the transportation infrastructure of VinCity Grand Park is quite complete, helping to clear the distance of a project far from the center.
District 9 is considered as the connecting gate of the entire southern region. Every year, Ho Chi Minh City is spending a small budget to invest in developing transport system for this area. Up to now, most of the major traffic projects of the city have come through District 9. Typical such as Ha Noi Highway, Long Thanh – Dau Giay Expressway …. Thanks to that, from District 9 to other places quickly:
– Phu My bridge takes about 15 minutes to reach Phu My Hung center.
– To District 1: move through Thu Thiem Tunnel or Hanoi Highway only takes about 20 minutes
– It takes about 45 minutes to get to Phu My Industrial Park
– It takes about 1h20 minutes to Vung Tau
– Moving to the new city of Binh Duong, Nhon Trach is easy
Along with that, District 9 is preparing to welcome new projects such as:
– Ben Thanh – Suoi Tien metro line is expected to be put into operation in 2020
– Ring Road 3 connects District 9 with the city center, Thu Thiem, Long Thanh Airport
– Prepare to have more Eastern bus station and a series of works
– Expand existing roads
It is known in the period 2017 – 2019, TP. Ho Chi Minh City will invest about VND1,174 billion in the East to build the Truong Phuoc Bridge and dredge the Tac River in District 9. This project will help the waterway network to grow dramatically, thus shortening the highway. Moved from the east of the city to Dong Nai. Along with that, many other projects are taking shape.
Thus, moving from District 9 to everywhere is getting easier and shortened in time. Therefore, a project located in the center of District 9 such as VinCity Grand Park can fully benefit when connected to the arterial axis.
You are reading the article VinCity Grand Park was benefited from District 9 transportation in the Real Estate category at https://realestatevietnam.com.vn/.Any information sharing, feedback please email to contact.vietnamrealestate@gmail.com, Hotline (+84) 898 898 688 (24/7).
Special thanks!